Skip to content

Service of UPS systems, batteries and rectifiers

Most of our work is service. We test UPS systems, rectifiers, inverters and battery systems. The most common faults are ageing batteries and hot connections.

A service visit

The load stays up throughout the visit. Anything that requires the UPS to be disconnected is done through the bypass.

  1. Alarms and logs

    We go through the alarm history and events since the last visit.

  2. Functional testing

    We test the UPS, rectifiers and inverters, and switch over to bypass and back.

  3. Battery measurement

    We measure and test the batteries. A single weak block can shorten the runtime of the whole string.

  4. Thermography

    We photograph connections and distribution with a thermal camera while under load. A loose or corroded connection runs hot and shows up in the image.

  5. Report

    You get the measurements and a list of what should be fixed, in order of priority.

Service contract or single visit

Most of our customers have a contract. You can also order a single check, for example before replacing batteries or after an outage.

Service contract

We visit at fixed intervals and carry out the same checks every time, so the measurements can be compared from year to year. You know in advance what service costs.

Single visit

Functional testing, battery measurement or thermography when you want to know the condition of the installation. It does not matter who installed it.

When the batteries need replacing

Batteries age even when they are not used, and faster in heat. When measurements show that capacity is approaching 80% of nominal, it is time to plan a replacement.

We sell and install new batteries and take care of the old ones.

Signs that it is time

  • The batteries are older than the manufacturer's design life.
  • Runtime under test is shorter than the installation was sized for.
  • Individual blocks stand out from the rest of the string in measurements.
  • The battery room regularly runs above 25 °C.

Start with a site visit